We make software production-ready.

Your business unit or start-up has built an application, and now it has to go live or serve more people. As a software consultancy that also delivers, we assess what your application needs to withstand in production, just as a structural engineer would, and add what is missing.

Fixed price: €600 plus VAT for the assessment report with a prioritised action plan. Senior engineering for existing teams.

On top, everything is finished. Underneath, the columns that carry operations are often missing.On top, everything stays as it is. Underneath, we put in the missing columns.
Real usersCustomer dataAudit
Your applicationlooks finishedproduction-ready
  • FoundationsWho may do what, and every change checked.
  • DataPasswords in the code, data can be lost.Passwords protected, data comes back.
  • UpdatesManual updates, no way back.Automated updates, back to the last version.
  • IncidentsUsers report the outage, the cause stays unclear.Reports outages and shows the cause.
Structure
Point at a column or tap it: one sentence explains the term.
Access
Governs who may see and change which data.
Tests
Run automatically on every change, including invalid input and denied access.
Secrets
Passwords and access keys are held in a protected store and not in the source code.
Backups
Save data in a form that has been verified as restorable.
CI/CD
Builds, checks and ships every change along the same automated route.
Rollback
Takes a faulty new version back to the last one that worked.
Monitoring
Reports outages and errors before users pick up the phone.
Observability
Shows, during an incident, where in the system the cause lies.
What the columns mean in operation
  • FoundationsWho may do what, and every change checked.
  • DataPasswords in the code, data can be lost.Passwords protected, data comes back.
  • UpdatesManual updates, no way back.Automated updates, back to the last version.
  • IncidentsUsers report the outage, the cause stays unclear.Reports outages and shows the cause.

What you have at the end of an Initial Assessment

An assessment report with an executive summary, evidenced findings, strengths, metrics and a prioritised action plan. That concludes the first engagement.

All findings and measurement conditions
From a real assessment reportExtract

12 findings

  • 2critical
  • 7high
  • 3medium
  1. Finding

    high

    A scheduled maintenance process checks every record individually and reports partial failures as success. 96 runs in 24 hours, none successful.

  2. Implementation

    The process is limited to records that are due, as part of a package of four measures.

  3. Measurement, whole package

    Maintenance process
    5,808 → 30 calls
    Median load time
    294 → 114 ms

Median across all pages, local measurement, same conditions before and after. The values apply to the whole package, not to any single finding. Client name and domain details removed.

Making home-built software production-ready

AI Production Readiness

Business units and start-ups build applications without development and operations teams of their own. We assess them against a fixed catalogue for what gets lost when nobody asked the AI the right question.

IT says no.
We turn objections into evidence-backed findings and prioritised actions.
A few users become many.
We assess performance, access and readiness for operations.
An audit or an insurer asks.
We document the assessed state. The report is not a guarantee.

The story of a bridge built over a weekend

To the example projects

Since

2002

Consultancy & Development

Software development, architecture, CI/CD and technical leadership, including at large corporations. Project teams consist solely of senior specialists, preferably on a fixed-price contract, or on a time-and-materials basis if you prefer.

  • Custom development to order
  • Senior engineering for existing teams
  • Training and process optimisation
To the references

Agents write the code. People answer for what goes live.

We work with AI assistance and to a fixed process. It applies regardless of which model happens to be ahead.

  1. Human

    Specification first

    Before any code exists, it is settled what the change has to do: workflows, permissions, failure cases and acceptance criteria.

  2. Agent

    Agents implement

    Agents work through the specification in small steps, each of which can be checked on its own.

  3. Agent

    Automated checks

    Tests, type checks, linters and AI-⁠assisted reviews. Whatever fails goes back to the agents.

  4. Human

    Human review

    Specialists read the change and check permissions, data flows and whether the tests test the right thing.

  5. Human

    Accountability

    Whoever signs off answers for putting it into service. We hand that to no model.

Getting started and prices

Initial Assessment

€600

Fixed price plus VAT

  • Up to 150,000 LOCWe assess codebases up to this number of lines of code.
  • Reviewed manually, by peopleAgainst defined criteria, within a few days.
  • Result: an assessment report with a prioritised action planPlus an executive summary, evidenced findings, strengths and metrics.
  • That concludes the first engagementThis does not yet lead to an implementation contract.
  1. Initial Assessment

    The report is delivered. You decide whether to continue.

  2. Fixed-price contract

    Scope, price and acceptance are set after the Initial Assessment.

  3. Managed support

    Contract with a guaranteed response time after go-live.

Consulting and engineering on a time-and-materials basis

from €960 per day plus VAT

All services in detail

Example projects

Our own software in our own operations: booking and administration for the Nüßleshof campsite, plus the ordering system for its restaurant.

Occupancy timeline in the administration of the Nüßleshof campsite with invented test bookingsTest data

Nüßleshof campsite

The website and administration are in use. Our own booking system is fully developed and remains switched off for guests by flag as long as the payment connection is missing.

January to March 2026: 118 commits, of which 114 with an AI co-author

View booking and administration

XRAI Order System

Guests order by QR code in the phone browser, and the kitchen works on a tablet. Built in May 2026, launched as a pilot.

84 test cases, CI with format check, lint, type check, tests and build

From QR code to kitchen

Agents write the code. People shape the game.

An independent project by people connected with XRAI: free browser games and miwale’s own game jams, where especially successful concepts receive awards and are presented on miwale.com. What makes it interesting is the division of labour between agents and people.

How miwale is made

You do not need a finished specification.

A task, an application or the question of what comes next is a good place to start.

Get in touch